DEMO is a first-of-a-kind DEMOnstration fusion power plant [1,2] and is intended to follow the ITER experimental reactor. The main goal of DEMO will be to demonstrate the possibility to produce electric energy for the grid from the fusion reaction early in the second half of the century. The injection of high energy neutral (1 MeV) particle beams is one of the main tools to heat the plasma up to fusion conditions, control the plasma burn phase and ramp the plasma down. Within the EUROfusion Framework a conceptual design of the Neutral Beam Injector (NBI) for the DEMO fusion reactor is currently being developed. Thereby, Reliability, Availability, Maintainability and Inspectability (RAMI) have to be taken into consideration for the conceptual design of the DEMO NBI, together with the exploitation of the currently available return of experience from the ITER NBIs. Comparing the failure risk of two different source concepts due to the considered failure modes has allowed for further design developments aiming at exploiting the advantages of the modular approach while minimizing its drawbacks.

RAMI evaluation of the beam source for the DEMO neutral beam injectors

Agostinetti P;
2020

Abstract

DEMO is a first-of-a-kind DEMOnstration fusion power plant [1,2] and is intended to follow the ITER experimental reactor. The main goal of DEMO will be to demonstrate the possibility to produce electric energy for the grid from the fusion reaction early in the second half of the century. The injection of high energy neutral (1 MeV) particle beams is one of the main tools to heat the plasma up to fusion conditions, control the plasma burn phase and ramp the plasma down. Within the EUROfusion Framework a conceptual design of the Neutral Beam Injector (NBI) for the DEMO fusion reactor is currently being developed. Thereby, Reliability, Availability, Maintainability and Inspectability (RAMI) have to be taken into consideration for the conceptual design of the DEMO NBI, together with the exploitation of the currently available return of experience from the ITER NBIs. Comparing the failure risk of two different source concepts due to the considered failure modes has allowed for further design developments aiming at exploiting the advantages of the modular approach while minimizing its drawbacks.
2020
Istituto per la Scienza e Tecnologia dei Plasmi - ISTP
Inglese
159
111628-1
111628-5
5
https://www.sciencedirect.com/science/article/abs/pii/S0920379620301769
Sì, ma tipo non specificato
RAMI
Evaluation
Beam source
Negative ion
Article Number: 111628 / Electronic ISSN: 1873-7196 / http://www.scopus.com/inward/record.url?eid=2-s2.0-85085255944&partner ID=q2rCbXpz / This work has been carried out within the framework of the EUROfusion Consortium and has received funding from the Euratom research and training programme 2014-2018 and 2019-2020 under grant agreement No 633053.
1
info:eu-repo/semantics/article
262
Agostinetti P.; Franke T.; Fantz U.; Hopf C.; Mantel N.; Tran M.Q.
01 Contributo su Rivista::01.01 Articolo in rivista
none
   Implementation of activities described in the Roadmap to Fusion during Horizon 2020 through a Joint programme of the members of the EUROfusion consortium
   EUROfusion
   H2020
   633053
File in questo prodotto:
Non ci sono file associati a questo prodotto.

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/20.500.14243/411697
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 15
  • ???jsp.display-item.citation.isi??? 15
social impact