The activities in Europe towards the development of the EC power sources for ITER are centered on the development of a 170GHz, 2MW, CW coaxial cavity gyrotron of collector potential depressed (CPD) type. A gyrotron with a higher unit power than the ITER reference (I MW) would yield a reduction of the installation costs, a more compact launcher design and, if required, an increase of the power delivered through one port. Tests proving the principle were successfully performed on a short-pulse experimental gyrotron delivering up to 2.2 MW in single mode. Following this success, a coordinated and fully consistent programme of development has been launched. The first industrial 2 MW prototype is now at an advanced stage of construction. The associated superconductive magnet producing 6.86 T on the cavity axis is also being procured. Dummy loads suitable for short and CW operation are also part of the development effort. Finally, a new EC test facility, with the features necessary for the testing of the gyrotron up to full power in CW, has been established and includes a fully solid-state power supply system. (c) 2007 Published by Elsevier B.V.

EC power sources: European technological developments towards ITER

Cirant S;
2007

Abstract

The activities in Europe towards the development of the EC power sources for ITER are centered on the development of a 170GHz, 2MW, CW coaxial cavity gyrotron of collector potential depressed (CPD) type. A gyrotron with a higher unit power than the ITER reference (I MW) would yield a reduction of the installation costs, a more compact launcher design and, if required, an increase of the power delivered through one port. Tests proving the principle were successfully performed on a short-pulse experimental gyrotron delivering up to 2.2 MW in single mode. Following this success, a coordinated and fully consistent programme of development has been launched. The first industrial 2 MW prototype is now at an advanced stage of construction. The associated superconductive magnet producing 6.86 T on the cavity axis is also being procured. Dummy loads suitable for short and CW operation are also part of the development effort. Finally, a new EC test facility, with the features necessary for the testing of the gyrotron up to full power in CW, has been established and includes a fully solid-state power supply system. (c) 2007 Published by Elsevier B.V.
2007
Istituto di fisica del plasma - IFP - Sede Milano
Electron cyclotron
Gyrotron
ITER
File in questo prodotto:
Non ci sono file associati a questo prodotto.

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/20.500.14243/43163
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 7
  • ???jsp.display-item.citation.isi??? 7
social impact