First plasma operation in ITER will start after completing the assembly of the tokamak vessel and the installation of the main sub-systems, but prior to the installation of the blanket modules and the divertor cassettes. Utilization of temporary limiters and divertor replacement structures will provide a poloidal and toroidal reference side position to the plasma edge to protect the vacuum vessel and other components already installed during operations. An additional set of mirrors is required to reflect the power injected from the upper launcher towards the plasma resonance for EC-assisted breakdown of the plasma up to a beam dump needed to trap and absorb the power of the beams after crossing the plasma in order to reduce the stray radiation escaping back into the vacuum chamber down to less than 10% of the total power. The quasi-optical system has been designed, with shape and size of the mirrors compliant with the requirements provided by ITER for their installation, realization and plasma performances, resulting in two standard focussing mirrors and one grating mirror. The beam dump consists of a box with five metal plates, the first providing a spreading of the high incident power and the others coated with absorbing material with thickness distribution studied to gradually reduce the power during the multiple reflections inside the box, avoiding damages to the coating itself. This work focuses on the validation of the quasi-optical design of the mirrors and the assessment of the dump performances, based on a multi-bounces model developed ad-hoc for this purpose. The study includes a tolerance analysis for the beam dump to include the effect of uncertainties in the thickness of the absorbing coating and misalignments of the mirrors, to verify the performances of the dump also when operating in different conditions with respect to the nominal ones.

Design validation of in-vessel mirrors and beam dump for first plasma operations in ITER

Fanale F;Bruschi A;Farina D;Figini L;Moro A;Platania P;
2021

Abstract

First plasma operation in ITER will start after completing the assembly of the tokamak vessel and the installation of the main sub-systems, but prior to the installation of the blanket modules and the divertor cassettes. Utilization of temporary limiters and divertor replacement structures will provide a poloidal and toroidal reference side position to the plasma edge to protect the vacuum vessel and other components already installed during operations. An additional set of mirrors is required to reflect the power injected from the upper launcher towards the plasma resonance for EC-assisted breakdown of the plasma up to a beam dump needed to trap and absorb the power of the beams after crossing the plasma in order to reduce the stray radiation escaping back into the vacuum chamber down to less than 10% of the total power. The quasi-optical system has been designed, with shape and size of the mirrors compliant with the requirements provided by ITER for their installation, realization and plasma performances, resulting in two standard focussing mirrors and one grating mirror. The beam dump consists of a box with five metal plates, the first providing a spreading of the high incident power and the others coated with absorbing material with thickness distribution studied to gradually reduce the power during the multiple reflections inside the box, avoiding damages to the coating itself. This work focuses on the validation of the quasi-optical design of the mirrors and the assessment of the dump performances, based on a multi-bounces model developed ad-hoc for this purpose. The study includes a tolerance analysis for the beam dump to include the effect of uncertainties in the thickness of the absorbing coating and misalignments of the mirrors, to verify the performances of the dump also when operating in different conditions with respect to the nominal ones.
2021
Istituto per la Scienza e Tecnologia dei Plasmi - ISTP
Inglese
172
11
112717-1
112717-7
7
https://www.sciencedirect.com/science/article/abs/pii/S0920379621004932
Sì, ma tipo non specificato
Electron cyclotron
Quasi-optics
Dumping components
Electronic ISSN: 1873-7196, http://www.scopus.com/inward/record.url?eid=2-s2.0-85108417253&partnerID=q2rCbXpz This work was carried out within the framework of the Service Contract IO/17/CT/4300001495 and has received funding from the ITER Organization. This work has been carried out within the framework of the EUROfusion Consortium and has received funding from the Euratom research and training program 2014-2018 and 2019-2020 under grant agreement No 633053.
12
info:eu-repo/semantics/article
262
Fanale, F; Bruschi, A; Darcourt, O; Farina, D; Figini, L; Gandini, F; Henderson, M; Hunt, R; Lechte, C; Moro, A; Platania, P; Plaum, B
01 Contributo su Rivista::01.01 Articolo in rivista
restricted
   Implementation of activities described in the Roadmap to Fusion during Horizon 2020 through a Joint programme of the members of the EUROfusion consortium
   EUROfusion
   H2020
   633053
File in questo prodotto:
File Dimensione Formato  
prod_459367-doc_178897.pdf

solo utenti autorizzati

Descrizione: Design validation of in-vessel mirrors and beam dump for first plasma operations in ITER
Tipologia: Versione Editoriale (PDF)
Dimensione 10.48 MB
Formato Adobe PDF
10.48 MB Adobe PDF   Visualizza/Apri   Richiedi una copia

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/20.500.14243/442027
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 1
  • ???jsp.display-item.citation.isi??? 2
social impact