The scope of this document is to describe the assembly of the SURPRISE demonstrator carried out in the frame of WP7, starting from the subsystems constructed in the frame of WP6. The demonstrator was assembled at CNR-IFAC premises. In the frame of WP7, the optical subsystem was coupled and aligned with the Target Scanning System (TSS). The Master Unit (MU), which provides for the synchronisation of sensors and actuators and for data handling was coupled with the electronics of the detectors, of the DMD and of the scanning system motors. Data handling unit, driven by sync electronics, also implements CS coding algorithms in its software.
D7.1 SURPRISE demonstrator
Valentina Raimondi;Lorenzo Palombi;Donatella Guzzi;Emiliano Marzi;Vanni Nardino;Cinzia Lastri;Massimo Baldi;Andrea Donati;Andrea Gonnelli
2022
Abstract
The scope of this document is to describe the assembly of the SURPRISE demonstrator carried out in the frame of WP7, starting from the subsystems constructed in the frame of WP6. The demonstrator was assembled at CNR-IFAC premises. In the frame of WP7, the optical subsystem was coupled and aligned with the Target Scanning System (TSS). The Master Unit (MU), which provides for the synchronisation of sensors and actuators and for data handling was coupled with the electronics of the detectors, of the DMD and of the scanning system motors. Data handling unit, driven by sync electronics, also implements CS coding algorithms in its software.I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.