In 2021 the NIO1 experiment has undergone a long period of maintenance and upgrade of its plants, in order to improve its performance and reliability in continuous operation. The experimental campaign aimed at getting a better control of Cs evaporation and at reaching 60÷100 A/m2 of extracted current density for 2 h.
Report on the cesium management studies in NIO1 for DEMO NBI and work plan for the next years
Barbisan, Marco
;Agostini, M.;Barbato, P.;Maniero, M.;Rizzieri,R.;Romanato, L.;Serianni, G.;Toigo,V.;Ugoletti,M.;
2022
Abstract
In 2021 the NIO1 experiment has undergone a long period of maintenance and upgrade of its plants, in order to improve its performance and reliability in continuous operation. The experimental campaign aimed at getting a better control of Cs evaporation and at reaching 60÷100 A/m2 of extracted current density for 2 h.File in questo prodotto:
File | Dimensione | Formato | |
---|---|---|---|
PRD-6.NBI.CS-T001-D001_-_Report_on_the_c_2PKQCW_v1_0.pdf
solo utenti autorizzati
Tipologia:
Versione Editoriale (PDF)
Licenza:
NON PUBBLICO - Accesso privato/ristretto
Dimensione
1.34 MB
Formato
Adobe PDF
|
1.34 MB | Adobe PDF | Visualizza/Apri Richiedi una copia |
I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.