This report presents the first complete natal dispersal trajectory of a female Montagu’s Harrier Circus pygargus, tracked in real time from fledging to first breeding using high-resolution continuous Global Positioning System (GPS) telemetry. The bird’s first flight occurred on 26 July 2024, initiating a 31-day post-fledging dependence phase (PFDP), followed by a 23-day pre-migratory phase (PMP), during which it explored areas up to 280.8 km from the nest and eventually settled ca. 190 km away in the Sirente-Velino Regional Park. From there, autumn migration began on 18 September 2024. The bird reached its first wintering site in Mali by 15 October. It used four wintering areas over 178 days, with a winter home range of 37,615.02 km2. Spring migration started on 11 April 2025 and lasted 21 days, ending with arrival in the Gran Sasso e Monti della Laga National Park (Central Italy) on 2 May. The bird used two main sites during the pre-breeding phase (PRBP) before laying eggs on 2 June 2025. The natal dispersal distance, from birthplace to nest site, was 151.28 km. Over 311 days, it covered a total of 14,522.23 km. These findings highlight the value of advanced telemetry in revealing early-life movement ecology and are useful for understanding species-specific patterns of survival, reproduction, and space use and can inform conservation actions.

From Nest to Nest: High-Precision GPS-GSM Tracking Reveals Full Natal Dispersal Process in a First-Year Female Montagu’s Harrier Circus pygargus

Monti, Flavio
Ultimo
Conceptualization
2025

Abstract

This report presents the first complete natal dispersal trajectory of a female Montagu’s Harrier Circus pygargus, tracked in real time from fledging to first breeding using high-resolution continuous Global Positioning System (GPS) telemetry. The bird’s first flight occurred on 26 July 2024, initiating a 31-day post-fledging dependence phase (PFDP), followed by a 23-day pre-migratory phase (PMP), during which it explored areas up to 280.8 km from the nest and eventually settled ca. 190 km away in the Sirente-Velino Regional Park. From there, autumn migration began on 18 September 2024. The bird reached its first wintering site in Mali by 15 October. It used four wintering areas over 178 days, with a winter home range of 37,615.02 km2. Spring migration started on 11 April 2025 and lasted 21 days, ending with arrival in the Gran Sasso e Monti della Laga National Park (Central Italy) on 2 May. The bird used two main sites during the pre-breeding phase (PRBP) before laying eggs on 2 June 2025. The natal dispersal distance, from birthplace to nest site, was 151.28 km. Over 311 days, it covered a total of 14,522.23 km. These findings highlight the value of advanced telemetry in revealing early-life movement ecology and are useful for understanding species-specific patterns of survival, reproduction, and space use and can inform conservation actions.
2025
Istituto di Ricerca sugli Ecosistemi Terrestri - IRET
breeding; dispersal; GPS tracking; Italy; movement ecology; raptor
File in questo prodotto:
File Dimensione Formato  
birds-06-00040.pdf

accesso aperto

Descrizione: articolo
Tipologia: Versione Editoriale (PDF)
Licenza: Creative commons
Dimensione 1.25 MB
Formato Adobe PDF
1.25 MB Adobe PDF Visualizza/Apri

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/20.500.14243/552242
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus ND
  • ???jsp.display-item.citation.isi??? ND
social impact