We describe the design and performance of the cryostat and the multi-stage sub-K single-shot sorption cooler for the MIllimeter Sardinia Radio Telescope Receiver based on Array of Lumped elements kids (MISTRAL) experiment. MISTRAL is a W-band (77 - 103 GHz) Ti/Al bi-layer Lumped Elements Kinetic Inductance Detectors (LEKIDs) camera working at the Gregorian focus of the 64 m aperture Sardinia Radio Telescope (SRT), located in Sardinia (Italy). The cryogenic system, based on a 1.5 W at 4.2 K Pulse Tube (PT) cryocooler, provides the 4 K base temperature for the sub-K refrigerator, and cools down the cold optics and the filters chain of the instrument. The sub-K sorption cooler consists of two intermediate stages, 4 He and 3 He sorption refrigerators that allow to reduce the heat load on the ultra-cold head, and a twin stage of 3 He sorption refrigerator providing the 0.2 K operation temperature for the 415-pixel array of LEKIDs. MISTRAL experiment was installed at SRT in May 2023, the technical commissioning started in June 2023. We will show the performance of the system in the laboratory.

The Cryogenic System of the MISTRAL Instrument: Design and In-lab Performance

Pettinari, G.;
2025

Abstract

We describe the design and performance of the cryostat and the multi-stage sub-K single-shot sorption cooler for the MIllimeter Sardinia Radio Telescope Receiver based on Array of Lumped elements kids (MISTRAL) experiment. MISTRAL is a W-band (77 - 103 GHz) Ti/Al bi-layer Lumped Elements Kinetic Inductance Detectors (LEKIDs) camera working at the Gregorian focus of the 64 m aperture Sardinia Radio Telescope (SRT), located in Sardinia (Italy). The cryogenic system, based on a 1.5 W at 4.2 K Pulse Tube (PT) cryocooler, provides the 4 K base temperature for the sub-K refrigerator, and cools down the cold optics and the filters chain of the instrument. The sub-K sorption cooler consists of two intermediate stages, 4 He and 3 He sorption refrigerators that allow to reduce the heat load on the ultra-cold head, and a twin stage of 3 He sorption refrigerator providing the 0.2 K operation temperature for the 415-pixel array of LEKIDs. MISTRAL experiment was installed at SRT in May 2023, the technical commissioning started in June 2023. We will show the performance of the system in the laboratory.
2025
Istituto di fotonica e nanotecnologie - IFN - Sede Secondaria Roma
Pulse tube cryocooler, W-band, Cryogenics, Ground-based telescope
File in questo prodotto:
File Dimensione Formato  
2025-Coppolecchia-JLTP-The Cryogenic System of the MISTRAL Instrument Design and In-lab Performance.pdf

accesso aperto

Licenza: Creative commons
Dimensione 2.07 MB
Formato Adobe PDF
2.07 MB Adobe PDF Visualizza/Apri

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/20.500.14243/554035
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus ND
  • ???jsp.display-item.citation.isi??? ND
social impact