The building of insulated boxes: Tests. The tests prescribed by the ATP (Agreement on the international carriage of perishable foodstuff and on the special equipment to be used for such carriage) shall be performed in some special facilities. ITC CNR built such an installation and tests have been carried out since 1978. The recent implementations in this plant are shown (mainly taking into account the automatic system of data acquisition and the elaboration of the test report).

Prove su casse isolate (ATP)

S Rossi;G Cuccato;G Cuogo;A Barizza;M Padula;PL Scala
2010

Abstract

The building of insulated boxes: Tests. The tests prescribed by the ATP (Agreement on the international carriage of perishable foodstuff and on the special equipment to be used for such carriage) shall be performed in some special facilities. ITC CNR built such an installation and tests have been carried out since 1978. The recent implementations in this plant are shown (mainly taking into account the automatic system of data acquisition and the elaboration of the test report).
2010
Istituto per le Tecnologie della Costruzione - ITC
File in questo prodotto:
File Dimensione Formato  
prod_72831-doc_36519.pdf

non disponibili

Descrizione: Articolo pubblicato
Dimensione 3.95 MB
Formato Adobe PDF
3.95 MB Adobe PDF   Visualizza/Apri   Richiedi una copia

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/20.500.14243/74926
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus ND
  • ???jsp.display-item.citation.isi??? ND
social impact