This paper describes the study conducted to design and evaluate a two-level on-line scheduler to dynamically schedule a stream of sequential and multi-threaded batch jobs on largescale grids, made up of interconnected clusters of heterogeneous machines. The scheduler aims to schedule arriving jobs respecting their computational and deadline requirements, and optimizing the utilization of hardware resources as well as software resources.
A two-level scheduler to dynamically schedule a stream of batch jobs in large-scale Grids
Baraglia R;Laforenza D;
2008
Abstract
This paper describes the study conducted to design and evaluate a two-level on-line scheduler to dynamically schedule a stream of sequential and multi-threaded batch jobs on largescale grids, made up of interconnected clusters of heterogeneous machines. The scheduler aims to schedule arriving jobs respecting their computational and deadline requirements, and optimizing the utilization of hardware resources as well as software resources.File in questo prodotto:
File | Dimensione | Formato | |
---|---|---|---|
prod_120666-doc_129222.pdf
solo utenti autorizzati
Descrizione: A two-level scheduler to dynamically schedule a stream of batch jobs in large-scale Grids
Tipologia:
Versione Editoriale (PDF)
Dimensione
72.5 kB
Formato
Adobe PDF
|
72.5 kB | Adobe PDF | Visualizza/Apri Richiedi una copia |
I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.