A key enabling feature to deploy a plan-based application for solving real world problems is the capability to integrate Planning and Scheduling (P&S) in the solving approach. Flexible Timeline-based Planning has been successfully applied in several real contexts to solve P&S problems. In this regard, we developed the Extensible Planning and Scheduling Library (Epsl) aiming at supporting the design of P&S applications. This paper describes some recent advancements in extending the Epsl framework by introducing the capability to reason about different types of "components", i.e., state variables and renewable resources, and allowing a tight integration of Planning and Scheduling techniques. Moreover, we present a domain independent heuristic function supporting the solving process by exploiting the hierarchical structure of the set of timelines making up the flexible plan. Some empirical results are reported to show the feasibility of deploying an Epsl-based P&S application in a real-world manufacturing case study.

Enriching a Temporal Planner with Resources and a Hierarchy-Based Heuristic

Umbrico Alessandro;Orlandini Andrea;
2015

Abstract

A key enabling feature to deploy a plan-based application for solving real world problems is the capability to integrate Planning and Scheduling (P&S) in the solving approach. Flexible Timeline-based Planning has been successfully applied in several real contexts to solve P&S problems. In this regard, we developed the Extensible Planning and Scheduling Library (Epsl) aiming at supporting the design of P&S applications. This paper describes some recent advancements in extending the Epsl framework by introducing the capability to reason about different types of "components", i.e., state variables and renewable resources, and allowing a tight integration of Planning and Scheduling techniques. Moreover, we present a domain independent heuristic function supporting the solving process by exploiting the hierarchical structure of the set of timelines making up the flexible plan. Some empirical results are reported to show the feasibility of deploying an Epsl-based P&S application in a real-world manufacturing case study.
2015
Istituto di Scienze e Tecnologie della Cognizione - ISTC
Inglese
AIxIA
9336
410
423
14
978-3-319-24308-5
Sì, ma tipo non specificato
23-25/09/2015
timeline-based planning
3
none
Umbrico, Alessandro; Orlandini, Andrea; Mayer Marta, Cialdea
273
info:eu-repo/semantics/conferenceObject
04 Contributo in convegno::04.01 Contributo in Atti di convegno
File in questo prodotto:
Non ci sono file associati a questo prodotto.

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/20.500.14243/333597
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 18
  • ???jsp.display-item.citation.isi??? 14
social impact