Flexible temporal planning is a general technique that has demonstrated wide applications possibilities in heterogeneous domains. A key problem for widening applicability of these techniques is the robust connection between plan generation and execution. This paper describes how a model-checking verification tool, based on UPPAAL-TIGA, is suitable for verifying flexible temporal plans. Moreover, we further investigate a particular perspective, i.e., the one of verifying dynamic controllability before actual plan execution.

Flexible Timeline-Based Plan Verification

Cesta A;Fratini S;Orlandini A;
2009

Abstract

Flexible temporal planning is a general technique that has demonstrated wide applications possibilities in heterogeneous domains. A key problem for widening applicability of these techniques is the robust connection between plan generation and execution. This paper describes how a model-checking verification tool, based on UPPAAL-TIGA, is suitable for verifying flexible temporal plans. Moreover, we further investigate a particular perspective, i.e., the one of verifying dynamic controllability before actual plan execution.
2009
Istituto di Scienze e Tecnologie della Cognizione - ISTC
978-3-642-04616-2
V&V
Planning
Timeline Reasoning
Formal Methods
Artificial Intelligence
File in questo prodotto:
Non ci sono file associati a questo prodotto.

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/20.500.14243/430937
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus ND
  • ???jsp.display-item.citation.isi??? ND
social impact