An overview is presented of the progress since 2021 in the construction and scientific programme preparation of the Divertor Tokamak Test (DTT) facility. Licensing for building construction has been granted at the end of 2021. Licensing for Cat. A radiologic source has been also granted in 2022. The construction of the toroidal field magnet system is progressing. The prototype of the 170 GHz gyrotron has been produced and it is now under test on the FALCON facility. The design of the vacuum vessel, the poloidal field coils and the civil infrastructures has been completed. The shape of the first DTT divertor has been agreed with EUROfusion to test different plasma and exhaust scenarios: single null, double null, X-divertor and negative triangularity plasmas. A detailed research plan is being elaborated with the involvement of the EUROfusion laboratories.

Divertor Tokamak Test facility project: status of design and implementation

Agostinetti P.;Alessi E.;Auriemma F.;Baiocchi B.;Bonanomi N.;Bonfiglio D.;Brombin M.;Bruschi A.;Carraro L.;Casiraghi I.;Causa F.;Cremona A.;Dalla Palma M.;De Angeli M.;Figini L.;Garavaglia S.;Gervasini G.;Gobbin M.;Granucci G.;Grasso D.;Innocente P.;Laguardia L.;Mantica P.;Mariani A.;Minelli P.;Moro A.;Murari A.;Muraro A.;Nowak S.;Pasqualotto R.;Platania P.;Pomaro N.;Ricci D.;Rigamonti D.;Rispoli N.;Rubino G.;Schmuck S.;Scionti J.;Senni L.;Simonetto A.;Sozzi C.;Spizzo G.;Spolaore M.;Taccogna F.;Tardocchi M.;Terranova D.;Uccello A.;Valisa M.;Vassallo E.;Veranda M.;Vincenzi P.;Zuin M.;
2024

Abstract

An overview is presented of the progress since 2021 in the construction and scientific programme preparation of the Divertor Tokamak Test (DTT) facility. Licensing for building construction has been granted at the end of 2021. Licensing for Cat. A radiologic source has been also granted in 2022. The construction of the toroidal field magnet system is progressing. The prototype of the 170 GHz gyrotron has been produced and it is now under test on the FALCON facility. The design of the vacuum vessel, the poloidal field coils and the civil infrastructures has been completed. The shape of the first DTT divertor has been agreed with EUROfusion to test different plasma and exhaust scenarios: single null, double null, X-divertor and negative triangularity plasmas. A detailed research plan is being elaborated with the involvement of the EUROfusion laboratories.
2024
Istituto per la Scienza e Tecnologia dei Plasmi - ISTP
Istituto per le applicazioni del calcolo - IAC - Sede Secondaria Napoli
Istituto dei Sistemi Complessi - ISC
divertor, exhaust, plasma scenarios
File in questo prodotto:
File Dimensione Formato  
Romanelli_2024_NuclFusion.pdf

accesso aperto

Descrizione: Divertor Tokamak Test facility project: status of design and implementation
Tipologia: Versione Editoriale (PDF)
Licenza: Creative commons
Dimensione 4.5 MB
Formato Adobe PDF
4.5 MB Adobe PDF Visualizza/Apri

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/20.500.14243/517241
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 9
  • ???jsp.display-item.citation.isi??? 6
social impact