Timeline-based planners have been shown quite successful in addressing real world problems. Nevertheless they are considered as a niche technology in AI P&S research as an application synthesis with such techniques is still considered a sort of "black art". Authors are currently developing a knowledge engineering tool around a timeline-based problem solving environment; in this framework we aim at integrating verification and validation methods. This work presents a verification process suitable for a timeline-based planner. It shows how a problem of flexible temporal plan verification can be cast as model-checking on timed game automata. Additionally it provides formal properties and checks the effectiveness of the proposed approach with a detailed experimental analysis.

Analyzing Flexible Timeline-based Plans

Cesta A;Fratini S;Orlandini A;
2010

Abstract

Timeline-based planners have been shown quite successful in addressing real world problems. Nevertheless they are considered as a niche technology in AI P&S research as an application synthesis with such techniques is still considered a sort of "black art". Authors are currently developing a knowledge engineering tool around a timeline-based problem solving environment; in this framework we aim at integrating verification and validation methods. This work presents a verification process suitable for a timeline-based planner. It shows how a problem of flexible temporal plan verification can be cast as model-checking on timed game automata. Additionally it provides formal properties and checks the effectiveness of the proposed approach with a detailed experimental analysis.
2010
Istituto di Scienze e Tecnologie della Cognizione - ISTC
Inglese
Helder Coelho; Rudi Studer; Michael Wooldridge
ECAI 2010 - 19th European Conference on Artificial Intelligence
ECAI 2010 - 19th European Conference on Artificial Intelligence
471
476
978-1-60750-605-8
http://www.booksonline.iospress.nl/Content/View.aspx?piid=17794
Sì, ma tipo non specificato
Lisbon, Portugal
Artificial Intelligence
Planning
Problem Solving with Timelines
Validation & Verification
6
none
Cesta, A; Finzi, A; Fratini, S; Orlandini, A; Tronci, ; E,
273
info:eu-repo/semantics/conferenceObject
04 Contributo in convegno::04.01 Contributo in Atti di convegno
File in questo prodotto:
Non ci sono file associati a questo prodotto.

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/20.500.14243/58762
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 21
  • ???jsp.display-item.citation.isi??? 10
social impact